Underworld members involved in polls in 4 districts

He also said that in the Gampaha District, several underworld members are working with the Government and even providing security for their election campaigning. CaFFE Executive Director, Keerthi Tenakoon, said that underworld members who were known to have been close with the United People’s Freedom Alliance (UPFA) have now shifted their support to the Government and are engaged in election campaigning in Colombo. Tenakoon said that in the Hambantota and Kandy Districts, owners of private security agencies are also contesting the August 17 Parliamentary election.He said that army deserters have been employed by some of these agencies and there is a fear that members of these agencies may clash when election day gets closer. (Colombo Gazette) Underworld members are involved in election related work in four districts, local election monitors said today.The Campaign for a Free and Fair Election (CaFFE) said that they have received information related to underworld members involved in election campaign work in Colombo, Gampaha, Hambantota and Kandy. read more

MTU Onsite Energy generator powers Teck rope shovel moves

first_imgAt Teck Coal’s Elk Valley operations as at other major mines, the rope shovels operate off main utility power via a nearby substation but also use a mobile power source during relocation, sometimes referred to as motivators. The existing 30-year old motivator was underpowered and frequently in need of maintenance, with significant downtime costs were significant. To solve the problem, Cullen Diesel, a local power products supplier, designed an innovative replacement specific to the mine needs which relies on a generator set from MTU Onsite Energy.The mining motivator is essentially a generator set on wheels and all of Teck’s Elk Valley sites share a single motivator. Until recently, this was a long-serving unit that had become outdated. “The old motivator was sufficient for some of our older shovels, but it was severely underpowered for a lot of our new shovels,” said Mehul Joshi, Electrical Engineer for Teck Coal. “It ran at 1,400 kW, and whenever we tried to move it, the breaker would trip, sometimes as many as four or five times during a move.”Joshi and his engineering team worked with Cullen Diesel Power in Vancouver, the local MTU Onsite Energy distributor, to design a new motivator specific to Teck’s needs. The power source in the new system is an MTU Onsite Energy generator set that includes an MTU 20V4000 G83L engine, which meets EPA Tier 2 emission standards in accordance with Teck’s specifications. The generator set’s power output is rated at 7,200 v and 2,575 kW at an elevation of 1,300 m. It is about 130% more powerful than the old one — and more than capable of meeting the 1,434 kW peak power needs of Teck’s newest shovels. More detail on this project will be provided in a future IM issue.last_img read more